DPWH Department Order 19 Solar Street Light Standard: What Contractors Must Know

Industrial lighting, valves, filtration and instrumentation for the Philippines since 2005sales@ultrapowerindustrialinc.com

DPWH Department Order 19 Solar Street Light Standard: What Contractors Must Know

November 13, 2026By Khalil Joseph Banares6 min read

Contractors who bid for solar street lighting on national roads need to read the governing standard, not a summary of it. The Department of Public Works and Highways (DPWH) issued Department Order No. 19, series of 2023, on solar-powered street lights, and project documents increasingly refer to it. Misreading it leads to non-responsive bids, rejected submittals and costly redesign.

This article sets out what the order covers, in plain language, and what contractors should do to prepare compliant proposals. It describes only what the order states and does not invent technical values. Always read the official order and the project technical specifications together. Ultra Power supplies XINTONG solar street lighting in the Philippines and welcomes enquiries from contractors preparing DPWH projects.

What the Order Is

DPWH Department Order No. 19, series of 2023, was signed on February 23, 2023 by Secretary Manuel M. Bonoan. It sets out standard design drawings for solar-powered street lights on national roads. In practice, it gives designers, contractors and inspectors a common reference for how solar street lighting should be arranged and detailed along the national road network.

Because it is a standard drawing issuance, it works together with the project plans, the specifications and the bidding documents. If there is any conflict or doubt, the contractor should raise a query during the bidding period.

Lamp Type and Light Colour

The order allows the lamp to be either high pressure sodium (HPS) or LED. It calls for warm white to warm yellow light and prohibits ultraviolet (UV) emission. This points contractors toward luminaires whose light colour falls in the warm range, and away from products that produce UV.

Contractors should present datasheets that state the light source type and colour clearly, so that evaluators can compare the offer with the order without guessing.

Ingress Protection

The order refers to an ingress protection rating of IP65 in accordance with IEC. IP65 means the enclosure is dust tight and protected against water jets. For Philippine roads, which face heavy rain and typhoons, this is a sensible baseline. Contractors should provide test reports or certificates that support the claimed rating, not only a catalogue statement.

Road Class and Pole Arrangements

The standard drawings arrange poles according to road class. For primary roads, the arrangements include single, axial, opposite and staggered layouts. For secondary roads, they include single, opposite and staggered layouts. For tertiary roads, they include single and staggered layouts.

The practical consequence is that the arrangement is not a free choice. It follows the class of the road and the layout shown in the project plans. Contractors should check which arrangement each road section requires before they price poles, arms and foundations.

What Varies by Project

The order recognises that wattage, mounting height, spacing and arm depth depend on road class, road width, number of lanes and junctions. A contractor therefore cannot assume one standard luminaire and one pole spacing for every project. The project plan and the lighting design calculations determine these values.

Prepare a lighting design for each road section that shows how the proposed luminaire, mounting height, spacing and arm depth meet the required lighting levels for that road class. Include a clear schedule of poles, luminaires, batteries and solar panels for each section.

Preparing a Compliant Bid

Read the order and the technical specifications together, and list every requirement in a compliance matrix. For each requirement, state the offered product feature and attach the supporting document. Typical supporting documents include datasheets, IP test reports, photometric files, warranties and manufacturer authorisation.

Confirm the supplier lead time, the delivery schedule and the availability of after-sales service, since the contractor remains responsible for the whole project.

Common Contractor Mistakes

Frequent mistakes include offering luminaires with a cool white light colour when the order points to warm white to warm yellow, submitting no proof of the IP rating, using one pole arrangement for all road classes, and leaving mounting height and spacing unsupported by calculation. Another mistake is copying a past bid without checking it against the current order.

Avoid these by building the compliance matrix early and having an engineer review it before submission.

DO 19 Requirements at a Glance

Topic What the Order Provides Contractor Action
Scope Standard design drawings for solar street lights on national roads Use as the reference with project plans
Lamp type HPS or LED State the light source clearly
Light colour Warm white to warm yellow; UV prohibited Offer matching colour; no UV emission
Ingress protection IP65 per IEC Provide test evidence
Primary roads Single, axial, opposite, staggered Follow the plan for each section
Secondary roads Single, opposite, staggered Follow the plan for each section
Tertiary roads Single, staggered Follow the plan for each section
Wattage, height, spacing, arm depth Depend on road class, width, lanes and junctions Support with lighting calculations

DO 19 Bid Preparation Checklist

  • Official order and project specifications read together
  • Compliance matrix prepared for every requirement
  • Road class identified for each section
  • Pole arrangement matches the road class and the plan
  • Light source type and warm colour stated
  • No UV emission confirmed
  • IP65 test evidence attached
  • Lighting calculations show wattage, height, spacing and arm depth
  • Datasheets, warranties and authorisation letters included
  • Delivery schedule and after-sales support confirmed

Frequently Asked Questions

What is DPWH Department Order 19 series of 2023?

It is an order signed on February 23, 2023 that sets standard design drawings for solar-powered street lights on national roads.

Does the order allow LED lamps?

Yes. It allows HPS or LED, with warm white to warm yellow light and no UV emission.

Does the order fix the wattage and pole spacing?

No. These depend on road class, road width, lanes and junctions, and are set by the project design.

Where should I raise doubts about the order?

Raise queries with the procuring entity during the bidding period, before bid submission.

Related Reading

Contact Ultra Power for Inquiries

Ultra Power supplies XINTONG solar street lighting for Philippine road projects and can help contractors prepare technical submittals against the order. Please contact Ultra Power for inquiries, and our engineering team will respond with practical guidance for your project.

Need a quotation or technical assessment?

Send the specifications. We respond within one business day.

Request Free Assessment

Download Our Free Industrial Lighting Compliance Guide

A complete reference for Philippine plant engineers and procurement officers.

Download Free Guide

Get the Ultra Power Company Profile 2026

Our products, brands, industries served and track record since 2005.

View Company Profile (PDF) →
© 2026 Ultra Power Industrial Resources, Inc. | Unit 105 Teylan Building, 6917 Washington St., Makati CityContact